Innovative pipework design overcomes performance problems
As part of Green’s ongoing work for various sites operated by one of the UK’s largest food processors, we recently developed and manufactured a large new pipework system for one of their primary LP steam headers. Our engineering design team analysed the proposed system and identified a number of problems. They devised solutions that were incorporated into a new design before the system was manufactured at our factory and supplied ready for installation. Result? Another delighted customer.