Client Feedback
“Seeing Green’s solutions in action at other plants gave us the confidence to ask them to help us make the improvements we needed at our plant. Their team have provided a full turnkey solution on time and on budget and worked 24/7 for 10 days to ensure the installation was completed to meet our timetable.”
Nick Tate, Performance Improvement Manager at Viridor
“Green’s was chosen by the customer because of their previous experience of supplying waste heat boilers into this market and globally. Their experience of design and engineering together, with their ability to meet the customer’s requirements, were a defining factor. Alongside Pivot Engineering, an established Bangladesh based installer, and Rolls-Royce as the engine provider the customer has a complete package of equipment, with a competitively priced UK designed boiler package.”
Asraf Ali, Pivot Engineering, Bangladesh
“While Green’s quotation was not the cheapest we received, it was very detailed and unlike some companies we have dealt with, there were no hidden costs afterwards. This job was not without its challenges, but Green’s handled them professionally and we will be looking to benefit from their expertise and their flexibility again in the future.”
Filip Lefever, Ship Manager at Matrix
“We were impressed by Green’s willingness to travel more than 6,000 miles to see our facilities first hand. We have also been extremely pleased by the performance and longevity of the economisers they supplied to us back in 1999 and the reputation they have for quality engineering and reliability.”
The manager, Boiler Maintenance Department – HPC Power Service Corporation
“We have been really pleased with all aspects of Green’s performance. From analysing our business and what we needed, through providing suitably robust and high performing bespoke products, to installing the system efficiently we are confident that they are a supplier that is happy to be accountable and we can trust in this vital area of our operation.”
“Green’s stainless steel H-fin solution and its proprietary design not only provides more free air space which results in less likelihood of blockages caused by ash, but also less chance of the metal distorting and causing leaks or other issues.”
Ian Williams, Manager – Jersey Waste
“Green’s support has been invaluable in helping us to decide on the optimum solution to meet our needs. Having their design, manufacture, installation and service teams available gives us confidence that they can look after all of our waste heat recovery system requirements effectively and efficiently, if the opportunity arises.”
Gustav Woudberg, Maintenance Manager – London Energy
“As one of the longest established manufacturers of economisers Green’s is very well known for its waste heat recovery systems and works with many organisations similar to ours. What we really like about them is their willingness to work in partnership with us to provide a bespoke solution that meets all of our unique needs and ensure that they can install during our planned outages to minimise disruption to our operations.”
Nazneem Grogan, Operations Director – LondonWaste
“When it comes to industrial boiler repairs Green’s is the natural choice and because they have been in the business for so long they not only have the expertise required they have the legacy information too, which is very valuable to us.”
Stuart Bell, Utilities Engineer – James Cropper
“When we identify performance problems with our boilers we ask Green’s to assess the severity and recommend the most effective ways to repair them. They implement their recommendations so that we are back online as quickly and efficiently as possible as well as satisfying our insurer’s requirements.”
Robert Cuthbert, Mechanical Engineer – Inovyn
“Green’s previously worked on Samjohn Liberty and we were impressed by their problem-solving skills and their ability to complete projects in a way that fits in with our tight schedules.”
John C Samonas – John Samonas and Sons
“Green’s delivered what our customer needed to meet extremely tight deadlines.”
Aki Karvonen, Project Manager – Andritz Power Plant Services Division
“Green’s team is both responsive and proactive, so we have no hesitation in using them for our clients who need a high quality service provided by experienced and qualified professionals to ensure their vessels are back at sea, working at optimum levels as quickly as possible.”
Frederic Broudin, Subcontracting and Supply Chain Manager – Damen Shiprepair
“We were extremely impressed by Green’s performance. They fabricated the system in ten weeks and, by working round the clock, installed it in just 12 days to ensure it was completed before the outage end date.”
Daniel Francis, Operations and Maintenance Manager – MWH
“We were reassured by Green’s impressive international list of reference sites which included other projects with high ash coal, as ours is 37%. We asked independent consultants to review the various proposals which were made to us and they were particularly impressed by the substantial increase in thermal performance, improved reliability and increased service life that the Green’s solution offers. And their pricing was competitive even after the cost of shipping from the UK to Australia. The first installation will take place during planned outages in 2017 and the second in 2018.”
Andrew Hassall, Boiler Engineer – Millmerran